[Construction of 42 Nos Ventilation Stopping (Through construction of RCC Slab) in Seam No. IV of 37L/21DE Panel and 14R/22LE Panel in UG at Umaria Colliery, Umaria Sub Area, Johilla Area]
[SECL/GM/JOH/Survey/ eTender/24-25/06 dt-02/05/2024][2024_SECL_307403_1]
|
South Eastern Coalfields Limited||Johilla Area
|
52. |
03-May-2024 10:00 AM |
18-May-2024 05:00 PM |
20-May-2024 11:00 AM |
[Fabrication and erection of steel structure of M and JK series of conveyor, gantry and feeder breaker for strengthening as per NDT recommendations of back up Gevra Project]
[SECL/GA/SO ENM/24-25/E-TENDER/17 dt.01/05/2024][2024_SECL_307359_1]
|
South Eastern Coalfields Limited||Gevra Area
|
53. |
06-May-2024 06:00 PM |
18-May-2024 06:00 PM |
20-May-2024 12:00 PM |
[Construction of 7nos. sectionalisation stoppings in between 10D and 11D from 68L to 74L of R-VII seam at 3and4 incline unit under JPC.]
[GM/JNR/CIVIL/e-Tender/24-25/01 Date- 29-04-2024][2024_ECL_307536_1]
|
Eastern Coalfields Limited||ECL_Jhanjra area
|
54. |
06-May-2024 06:00 PM |
18-May-2024 06:00 PM |
20-May-2024 12:00 PM |
[Construction of false roofing with girders and precast blocks upon brick side walls at -13XD drift in RVIIA seam of 3 and 4 incline under JPC.]
[GM/JNR/CIVIL/e-Tender/24-25/03 Date- 29-04-2024][2024_ECL_307549_1]
|
Eastern Coalfields Limited||ECL_Jhanjra area
|
55. |
08-May-2024 05:00 PM |
18-May-2024 06:00 PM |
20-May-2024 10:00 AM |
[Repairing of LnT CK300 Shovel Sl. No. E165, CIL No. 2729.]
[SDOCM/PE(X)/E-Tender/24-25/04][2024_CCL_307686_1]
|
Central Coalfields Limited||Dhori
|
56. |
11-May-2024 12:00 PM |
18-May-2024 06:00 PM |
20-May-2024 10:00 AM |
[AMC (Annual Maintenance Contract) for Shatabdi Road weighbridge (capacity 60 T) of Barora Area. ]
[BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/113][2024_BCCL_307933_1]
|
Bharat Coking Coal Limited||BCCL_BARORA AREA
|
57. |
08-May-2024 06:00 PM |
18-May-2024 06:00 PM |
20-May-2024 10:00 AM |
[Preventive maintenance and repairing of 11KV and 3.3KV production overhead line during monsoon of Balkudra O/S under Bhurkunda Project under Barka Sayal Area.]
[PE(EnM)/BHK/e Tender/24-25/02][2024_CCL_307718_1]
|
Central Coalfields Limited||Barka Syal
|
58. |
09-May-2024 12:00 PM |
18-May-2024 06:00 PM |
20-May-2024 11:00 AM |
[Diversion of 11 KV JBVNL OH line with 2 X25 KVA DTR (Distribution Transformer) for mines extension near Pannatand Tola, Aara under Chamtat patch, Magadh OCP, M-S area]
[GM(MS)/SO(EnM)/e-NIT/24-25/16][2024_CCL_307750_1]
|
Central Coalfields Limited||Magadh and Amrapali
|
59. |
09-May-2024 12:00 PM |
18-May-2024 06:00 PM |
20-May-2024 11:00 AM |
[Providing and laying OFC for live streaming at control room (i.e. New GM Office) from various weighbridges and check post of Kundi patch, Chamatu patch and Devalgadda patch under Magadh- OCP, M-S Area]
[GM(MS)/SO(EnM)/e-NIT/24-25/17][2024_CCL_307751_1]
|
Central Coalfields Limited||Magadh and Amrapali
|
60. |
06-May-2024 06:00 PM |
18-May-2024 06:00 PM |
20-May-2024 12:00 PM |
[Construction of 7nos. sectionalisation stoppings at -1XD, 0XD, 1XD, 2XD in between 35L and 36L and 34L, 35L in between -1XD and -2XD and 36L in between 2XD and 3XD of R-VIIA seam at 3and4 incline unit under JPC.]